久久久久久噜噜噜久久久精品-久久久久久久综合日本亚洲-久久久久久久综合狠狠综合-久久久久久久影院-午夜精品一区-午夜精品亚洲

E-Mail: sale@zsshili.com | Hotline:0760-22601408
Home > News >>  News center
Project winding machine should be inspected before use
Date:2019-09-30 08:54:54 Click:
 

①The winding machine in the start before use, should check the nameplate, check the detailed circuit and starting equipment and other related device, each part of the circuit are properly connected, grounding is reliable, the fuse is not in good condition and in conformity with the provisions,switch, contactor is good, circuit breaker, short circuit fault,will cause damage to the motor.

②The winding machine connected to the power supply before,should check the insulation condition, if the insulation resistance is insufficient, should be dry processing, check insulation of rotor winding, calibration of carbon brush spring pressure, remove the slip rings and carbon brushes

The dirt on the surface of.

③ winding machine before use, should do first rotation direction suddenly seized load operation, inspection winding machine is correct, to change the steering, just an arbitrary two-phase wiring winding machine can be reversed. While winding machine is functioning properly observed, with or without abnormal noise or vibration, etc., to be proved after all normal, only with a load start.



Project winding machine should be inspected before use

 

Previous:Automatic coil winding machine safety regulations for technical operations

Next:Small winding motor speed slow! What is the reason?

主站蜘蛛池模板: 日韩黄色影院 | 特一级黄色片 | 在线观看黄日本高清视频 | 四虎影免看黄 | 日日摸日日添夜夜爽97 | 青草草在线 | 天天做天天操 | 日本高清免费不卡在线 | 一级做a爰片久久毛片人呢 一级做a爰片久久毛片免费看 | 日韩在线免费 | 色综合天天综合高清影视 | 性大交 | 亚洲欧美日韩在线播放 | 日本高清在线一区 | 伊人国产在线视频 | 一区二区三区国产美女在线播放 | 日韩精品福利在线 | 日韩一级二级三级 | 永久免费精品影视网站 | 日本大片免a费观看在线 | 色丁香在线 | 欧美又粗又大又硬又长又爽视频 | 无码精品一区二区三区免费视频 | 天天天天添天天拍天天谢 | 亚洲www在线| 无需付费免费mv网站 | 色天使在线播放 | 亚洲第一国产 | 婷婷六月久久综合丁香乐透 | 青娱乐福利 | 亚洲v欧美 | 天天成人综合网 | 亚洲三级在线观看 | 青青青青手机在线视频观看国产 | 伊人www| 一级一级一级毛片免费毛片 | 亚州国产 | 午夜精品久久久久久中宇 | 日韩精品久久久毛片一区二区 | 一区精品麻豆入口 | 亚洲免费精品视频 |