久久久久久噜噜噜久久久精品-久久久久久久综合日本亚洲-久久久久久久综合狠狠综合-久久久久久久影院-午夜精品一区-午夜精品亚洲

E-Mail: sale@zsshili.com | Hotline:0760-22601408
Home > News >>  News center
Automatic winding machine inspection before the operation
Date:2019-09-24 08:14:38 Click:
 

Frist, fully automatic winding machine, winding machine and auxiliary equipment inspection and maintenance

1. Inspection and maintenance of horizontal winding machine

1) Always check the lubrication of all moving parts, ensure good lubrication.

2) Always check all parts of fastening bolts loose to timely discovery tightened, especially tailstock foot bolts must be solid and reliable.

3) when the machine is rotated, the following operation is not allowed in the winding.

4) work, always check the disk, whether the top bend and fracture phenomena tailstock, identify problems and timely repairs.

5) when the machine is rotated, does not allow for commutation, speed shift and other operations.

2. Inspection and maintenance of vertical winding machine

1) Check the winding machine and winding butted whether faceplate bolts have been tightened, otherwise it must be re-tightened.

 2) Power Winder is damaged, such as insecurity, if it should be ruled out.

3) Check the telescopic retractable cover is good, and adjust the size of the opening and closing the distance to the faceplate or wound around the outer diameter of the winding 150ram, in order to ensure safe operation. Around

4) Check whether the strap winder or interfere with the operation of the tooling or other objects, or should be arranged in line reconnection position tray and other tooling objects.

The above content after check, can start winding machine winding operation.

SecondInspection and maintenance of winding clamping machine and the assembled rack.

1) Lift the system is working properly, if there is stuck, tilted fault stall or unsafe factors, should ask the professionals repair and eliminate insecurity.

2) the electrical part of the power and the shield is damaged, such as insecurity exists, if it should be excluded.

3) whether winding center clamping mechanism on the positive, otherwise the response is positive.

4) Whether the operator, starting compactors, the following person is not allowed to stand at compactor.

5) hydraulic compactor must check the pressure gauge is within the period of use, the reading is correct, whether hydraulic station is working properly, the hydraulic oil is adequate, or should be ruled out before use.


Automatic winding machine inspection before the operation

 

 

Previous:Lubrication Winder equipment

Next:Winder started when matters must be noted

主站蜘蛛池模板: 亚洲video| 天天干夜夜看 | 日日噜噜夜夜狠狠久久丁香 | 亚洲 国产精品 日韩 | 最新中文字幕一区 | 日韩欧美小视频 | 色吊丝最新永久免费观看网站 | 天堂中文资源在线地址 | 天天干天天操天天干 | 伊人色婷婷综在合线亚洲 | 日韩毛片免费视频一级特黄 | 亚洲视频免费播放 | 特级黄色视频毛片 | 五月天激情婷婷大综合 | 永久免费观看午夜视频在线 | 青春草免费视频 | 日韩中文在线观看 | 日本高清一区二区三区水蜜桃 | 天色噜噜噜噜 | 亚洲成a人片在线观看www | 日本爱爱视频网站 | 自拍亚洲 | 日韩中文字幕网站 | 亚州一级毛片 | 欧美综合图区亚洲综合图区 | 日韩精品亚洲人成在线观看 | 自拍视频在线播放 | 日本综合欧美一区二区三区 | 在线精品欧美日韩 | 日韩一区国产一级 | 手机看片国产精品 | 手机在线播放av | 亚洲天堂在线观看完整版 | 欧美又粗又硬 | 羞羞答答免费人成黄页在线观看国产 | 欧美一级鲁丝片免费看 | 人人草97 | 亚洲国产日韩欧美在线a乱码 | 日本在线不卡免 | 日韩三级一区二区 | 色综合五月婷婷 |