Specification for safe operation of CNC winding machine
Date:2019-12-17 08:47:37 Click:
 

In order to guide the use of the equipment to the correct operation of CNC winding machine, to prevent improper operation caused by the safety accident, so that the equipment to maintain good running state, and to develop the following rules:

One week inspection:

1, check the power supply internal connection wire is loose, wire insulation glue whether scratch or broken exposed copper core wire;

2, check whether the power supply voltage of CNC winding machine is 220V + 10V;

3, check the automatic upper and lower material cylinder SENSOR line and trachea whether or not broken or clip, indicating lamp state;

4, check the automatic upper and lower material protection cover is normal;

5, check whether the automatic upper and lower material expansion is normal;

6. Check the safety cover of the CNC winding machine to start the switch;

7, check the CNC winding machine to stop the switch function is normal, whether the emergency stop switch can be locked, indicating the state of light;

8, check the teaching box on the key functions are normal;

9, check whether the CNC winding machine tension device is normal;

10 checking whether the safety protection cover of the feeding area on the automatic feeding machine is normal.

Two, note:

1, the adjustment machine personnel must pass through the specialized training examination qualified, is familiar with the adjustment machine rule and the maintenance skill;

2, before the machine will teach the box to stop the switch to press the lock, press the rules of the machine operation;

3, hold down the button box to teach is not more than 1SEC at a time, to prevent a needle frame collision fixture;

4, fault repair must be the teaching box and the switch on the panel to stop switch on (Hong Dengliang);

Must confirm the guide needle frame at 90 degrees 5, boot before returning;

6, around the line staff must be the hair before the hair in the anti - static cap, not to reveal the forehead hair;

7, the seat on the designated line within the body, and the winding shaft distance 40cm minimum, may not be resting on the table;

8, when the winding hands to lift the work, when necessary, the hand can be placed in the middle of the material box position, hand can not be placed on the upper and lower cylinder up and down, before and after, flip the gap, to prevent the injury of the hand;

9, wear line must be a quick stop switch on the panel to open, after confirmation of the red light, it can be carried out in line operation;

10, clean the waste wire must be on the front of the emergency stop switch on the panel to confirm the red light, can be carried out;

11, automatic feeding must check whether the material feeding machine tool before operation, if there is a need to take the material before starting materials;

12, machine failure, the staff can not be allowed to handle, must be notified to the mechanic repair, and indicate the state of failure.

 

Specification for safe operation of CNC winding machine

 

Previous:Development of production technology of CNC winding machine

Next:The rational use and maintenance of CNC winding machine

主站蜘蛛池模板: 天堂网免费 | 人人看人人鲁狠狠高清 | 色综合久久中文字幕网 | 欧美怡红院免费全部视频 | 日韩在线视频中文字幕 | 五月婷婷在线观看 | 日本亚洲视频 | 日日天干夜夜人人添 | 色综合天天综合网国产成人 | 日韩精品三级 | 日韩看片网站 | 日本99视频 | 色爱区综合激情五月综合激情 | 日韩精品欧美国产精品忘忧草 | 四虎免费在线观看 | 天堂亚洲网 | 天天干天天拍天天射 | 日韩专区在线 | 伊人免费在线观看 | 综合五月天婷婷丁香 | 天天操天天操 | 日韩去日本高清在线 | 亚州va| 午夜男人天堂 | 一区二区色 | 午夜影院在线视频 | 天天操天天操天天操 | 在线a久青草视频在线观看g | 亚洲国产成人久久一区www妖精 | 夜夜爽一区二区三区精品 | 特级淫片国产免费高清视频 | 四虎www成人影院观看 | 日韩a在线观看免费观看 | 亚洲乱码国产一区网址 | 天天干天天草天天 | 日本道综合一本久久久88 | 色偷偷亚洲第一成人综合网址 | 日本成年人免费看 | 一级片aaaa| 亚洲一区二区三区四区在线 | 婷婷色九月综合激情丁香 |